Which of the following is NOT considered the cause of cost overrun?

Prepare for the CMAA Construction Management Exam. Study with flashcards and multiple choice questions, each question is equipped with hints and detailed explanations. Get ready for a career leap!

Multiple Choice

Which of the following is NOT considered the cause of cost overrun?

Explanation:
The thing being tested is what tends to push a project’s costs above the planned budget. When you underestimate cost and the length of delays, you don’t build enough contingency for time and expenses, so actual spending can easily outrun the budget. Safety and environmental risk introduces hidden costs—unforeseen permits, cleanup, fines, or mandatory redesigns—that spike expenditures beyond what was planned. A lack of managerial strategies means weak controls, poor scheduling, and inefficient procurement, all of which can drive costs up through wasted resources and change orders. Overestimating, however, sets a higher budget than might be needed, creating a cushion that makes overruns less likely; in practice, this tends to prevent cost overruns rather than cause them.

The thing being tested is what tends to push a project’s costs above the planned budget. When you underestimate cost and the length of delays, you don’t build enough contingency for time and expenses, so actual spending can easily outrun the budget. Safety and environmental risk introduces hidden costs—unforeseen permits, cleanup, fines, or mandatory redesigns—that spike expenditures beyond what was planned. A lack of managerial strategies means weak controls, poor scheduling, and inefficient procurement, all of which can drive costs up through wasted resources and change orders. Overestimating, however, sets a higher budget than might be needed, creating a cushion that makes overruns less likely; in practice, this tends to prevent cost overruns rather than cause them.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy